Each type of damper support system.
Ceiling radiation damper installation.
5 ceiling radiation dampers dampers supported from ductwork above note about support when main ducts are supported by 16 ga.
Steel channels with 9 16 in.
Up to 3 hour ceiling radiation damper installation instructions ceiling radiation dampers ii cfd15 february 2013 a.
Up to 3 hour ceiling radiation damper installation instructions c e i l i n g r a d i a t i o n d a m p e r s i c f d 1 5 m 6 1 0 2 7 1 a p r i l 2 0 2 0 a.
Approved ul 555c ul 263 wood truss floor ceiling.
Preventing the transfer of heat and flames into attic and crawlspaces is essential in limiting the amount of damage done in the event of a fire.
To better understand ceiling radiation dampers.
Ceiling radiation damper installation operation maintenance instructions iom ceiling radiation dampers 1016 nca manufacturing inc.
Unlike spring loaded fire dampers and smoke dampers ceiling radiation dampers from lloyd industries limit the transfer of heat into attics or through openings in the ceilings and floors.
The ceiling damper shall be attached to a minimum 22 gauge 0 85 steel sleeve duct drop by welding or with rivets or with 10 m5 sheet metal screws or with quick lock or bolted with 1 4 6 20 bolts at 6 152 o c.
Each type of damper support system is described with damper being mounted in conjunction.
Ceiling fire dampers also known as radiation dampers are designed and tested to limit the radiant heat transfer through an air inlet outlet opening in the ceiling membrane of a fire resistance rated floor ceiling or roof ceiling assembly.
X 11 2 in.
These installation instructions apply to ceiling radiation dampers mounted in 3 hour rated ceiling with supports from 1 a ceiling grid system 2 ductwork above or 3 structure above.
Minimum flanges located 1 inch to 3 inches from and on both sides of a steel duct drop and these channels are suspended by 12 swg wire from.
The ceiling damper shall be attached to a minimum 22 gauge 0 85 steel sleeve duct drop by welding or with rivets or with 10 m5 sheet metal screws or with quick lock or bolted.
These installation instructions apply to ceiling radiation dampers mounted in 3 hour rated ceiling with supports from 1 a ceiling grid system 2 ductwork above or 3 structure above.